Welcome!

This forum has been designed as a Technical Support Hub for frequently asked questions we receive on the Air Handling products we supply.

Along with tutorials on navigating through our iSmart Air Handling Unit Software, this forum is home to troubleshooting guides for products such as CAREL, Belimo, Titan, Axio, Sontay and many more. Please get in touch if you have a query that you haven't found an answer to below. 

0

0
Avatar

FAQ

--FAQ--

2556
| 2 1 1
--FAQ--
FAQ
On 3/24/20, 10:43 AM

CARAEL has plans to phase-out pCO1 and pCOC programmable controllers.

Part numbers involved in the phase-out are the following:

  • PCO1****S*, PCO1****M*, all the accessorizes (PCO100CEF0, PCO100KEY0, PCO1**CLK0), the connectors and any kit containing these part numbers

  • PCOC****** and any kit containing the part number


Reason for termination

The pCO1 and pCOC range of Programmable Controller were introduced to the market in 2002.

After years of good selling performance they are in declining phase. The service level is continuously dropping: reduced volumes imply a reduction in lot size and sub-optimal use of production lines. Products leadtimes keep increasing.

Moreover, pCO1 and pCOC are produced using some components that are becoming obsolete and difficult to retrieve.


Replacement part numbers

pCO1 and pCOC can be replaced by the best matching pCO5+ size. Please note, that there is not a pin to pin compatible solution. To choose the best option please consult the following comparison table:

ModelSize(DIN)AIDIAODO
pCO1S136848
pCO5+S*135848
pCO1M18814413
pCOC17812213
pCO5+M*18814413

* AI is Universal channel in pCO5+

The software application currently running on pCO1/pCOC must be verified and recompiled to run in a pCO5+.


The pCO1 and pCOC termination has the following schedule:

  • Last Order Date (LOD):December 31, 2020

  • Last Shipment Date (LSD): July 1, 2021


Please note after LOD date all late orders will be discarded.

Production will continue only for orders booked within LOD.

After LSD all production lines will be decommissioned.

Repairs and spare parts after LSD will be guaranteed with the original (pCO1 or pCOC) or functionally equivalent products (pCO5+), according to availability.


Keep Informed

About This Community

This forum has been designed as a Technical Support Hub for the range of Air Handling Control Products supplied by iACS About Us

Question tools

5 follower(s)

Stats

Asked: 3/24/20, 10:24 AM
Seen: 30 times
Last updated: 3/24/20, 10:43 AM